Skip to content
Aerial view of the Palm Grove Estate construction site in Katampe Extension, Abuja
Ongoing

Palm Grove Estate

Katampe Extension, Abuja

Location
Katampe Extension, Abuja
Unit types
3 & 4-bedroom terraces and semi-detached homes
Size range
150 – 240 sqm
Completion
Expected completion December 2026

Overview

About this development

Palm Grove Estate is a deliberately unhurried project. We completed all civil works — estate roads, drainage, boundary wall and the gatehouse — before marketing began, so buyers walking the site see infrastructure that already exists rather than a rendering of what's promised.

Forty-eight homes are planned across 3-bedroom terraces and 4-bedroom semi-detached units, arranged around a shared green corridor rather than a single access road. Groundworks on the first block began in February 2025 and superstructure work is now underway on blocks A and B.

Off-plan pricing remains available on unreleased blocks, with a staged payment plan running to estimated completion in December 2026. Site visits run every Saturday morning — no appointment required.

Gallery

A closer look

Amenities

What's included

  • Gated close with manned entrance
  • Paved estate roads and underground drainage (complete)
  • Private garden per home
  • Dual power supply with automatic changeover
  • Borehole water treatment plant
  • Children's playground
  • CCTV coverage on the perimeter wall
  • Estate facilities office

Floor Plans

Unit layouts

Indicative layouts for the unit types available on this development. Final construction drawings may vary slightly.

Floor plan for 3-Bedroom Terrace, 150 square metres
3-Bedroom Terrace3 Bed • 3 Bath 150 sqm
Floor plan for 4-Bedroom Semi-Detached, 240 square metres
4-Bedroom Semi-Detached4 Bed • 4 Bath 240 sqm

Location

Katampe Extension, Abuja

Cadastral Zone C09, Katampe Extension, Abuja

Interested in Palm Grove Estate?

Speak with our sales team about availability, pricing and payment plans, or book a site visit at a time that suits you.